Hubble is officially recognised and fully integrates with Luxpower inverters. The following field guide will assist with the correct battery settings you should use.

For further detailed information ensure you read the manual of the supplied battery regarding setup and installation instructions.

*12kW Luxpower Inverters are still under testing.

WARNING

Working with high-voltage systems is dangerous. Do not attempt to modify your inverter and battery setup unless you are certain you understand the risk. Speak to a qualified electrician if you are unsure.

INVERTER EXAMPLE

LuxPower inverter

INVERTER SETTINGS

IMPORTANT

On the inverter, setup the charge/discharge profile AND setup the allowed charging times (P1, P2 and P3). (The default settings won’t allow the inverter to charge the battery using Mains power).

Model
Voltage
Equalised
Float
Cutoff
Charge Amps
Max Discharge Current
S-SERIES
12V
14
14
12
30A
100A
X-100
48V
52.8
52.8
44
30A
100A
X-101
48V
53.8
53.8
44
30A
100A
X-200
36V
41.5
41.5
34
30A
100A
AM-2
48V
53.8
53.8
44
30A
100A
AM-3
48V
53.8
53.8
44
20A
50A
AM-4
24V
29
28.5
22
30A
100A
AM-5
48V
55.2
55.2
47
30A
100A
AM-10
48V
55.2
55.2
47
60A
150A
BLADE
48V
55.2
55.2
47
50A
200A

STEPS TO CONNECT THE LUXPOWER LXP5K HYBRID:

  1. Set Hubble MASTER dip to 1000 if AM-2 or AM-4. If AM-5 or AM-10 model set master dip to 0000.

  2. Set Hubble Slaves to their respective addresses as per manual.​

  3. Use CAN out on MASTER to Luxpower inverter.

  4. Go to BATTERY Settings.

  5. Select Lithium.

  6. Select PYLON

STEPS TO CONNECT TO THE LUXPOWER SNA5KW:

  1. Set Hubble MASTER dip to 1000 if AM-2 or AM-4. If AM-5 or 
    AM-10 model set master dip to 0000.

  2. Set Hubble Slaves to their respective addresses as per manual.

  3. Use CAN out on MASTER to Luxpower inverter.

  4. On the SNA, go to the MENU.

  5. Select option 3 for Battery settings.

  6. Select Lithium battery.

  7. Select BRAND 2

PIN LAYOUTS & CLOUDLINK

*Please note: Hubble Energy recommends the Cloudlink Device on Luxpower installations. It is not required but recommended.

Check both the user-manual and the packaging of your inverter for its CAN pinout. Some Luxpower units use pins 4 and 5, whereas others still use pins 3 and 4.

CLOUDLINK

The Cloudlink will connect to the Battery via:

Cloudlink’s (Serial/RJ12 Port) to the Battery (RS232/RJ12 Port)

(Black Cable) – RJ12 to RJ12 (450mm) cable.

RJ45 PIN LAYOUTS

The Luxpower Inverter will connect to the Battery via:

Inverter (CAN Port) to Battery (CAN Port)

Straight RJ45 to RJ45 wire - 1500mm. 

Ensure that the clip is pointed away from you when counting the pins.

 

LXP RANGE: LUXPOWER USING PINS 3 & 4 FOR INVERTER

PIN
Inverter
X-101/AM-4/AM-2
AM-5/AM-10
Blade
1
-
-
-
-
2
-
-
-
-
3
CANL
-
-
-
4
CANH
CANH
CANH
CANH
5
-
CANL
CANL
CANL
6
-
-
-
-
7
-
-
-
-
8
-
-
-
-

Please Note: The LXP is a hybrid inverter that requires solar to charge the battery to 100%.

SNA RANGE: LUXPOWER USING PINS 4 & 5 FOR INVERTER

PIN
Inverter
X-101/AM-4/AM-2
AM-5/AM-10
Blade
1
-
-
-
-
2
-
-
-
-
3
-
-
-
-
4
CANH
CANH
CANH
CANH
5
CANL
CANL
CANL
CANL
6
-
-
-
-
7
-
-
-
-
8
-
-
-
-

3 & 4 Pin Layout image reference seen below:

LuxPower inverter setup guide

4 & 5 Pin Layout image reference seen below:

LuxPower inverter setup guide

HUBBLE DIP SWITCH SETTINGS

FOR MULTIPLE BATTERY INSTALLATION

For correct setup and communication, each battery needs a unique serial address to communicate. If you are only using one battery in your setup, consider this the master battery and ensure you set it to address 1.

AM-2, AM- 4 & BLADE DIP SWITCHES

ADDRESS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
#1
#2
#3
#4
1
ON
OFF
OFF
OFF
2
OFF
ON
OFF
OFF
3
ON
ON
OFF
OFF
4
OFF
OFF
ON
OFF
5
ON
OFF
ON
OFF
6
OFF
ON
ON
OFF
7
ON
ON
ON
OFF
8
OFF
OFF
OFF
ON
9
ON
OFF
OFF
ON
10
OFF
ON
OFF
ON
11
ON
ON
OFF
ON
12
OFF
OFF
ON
ON
13
ON
OFF
ON
ON
14
OFF
ON
ON
ON
15
ON
ON
ON
ON

AM-5 & AM-10 DIP SWITCHES (4-DIP VERSION)

ADDRESS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
#1
#2
#3
#4
1
OFF
OFF
OFF
OFF
2
ON
OFF
OFF
OFF
3
OFF
ON
OFF
OFF
4
ON
ON
OFF
OFF
5
OFF
OFF
ON
OFF
6
ON
OFF
ON
OFF
7
OFF
ON
ON
OFF
8
ON
ON
ON
OFF
9
OFF
OFF
OFF
ON
10
ON
OFF
OFF
ON
11
OFF
ON
OFF
ON
12
ON
ON
OFF
ON
13
OFF
OFF
ON
ON
14
OFF
ON
ON
ON
15
ON
ON
ON
ON

AM-10 (8-DIP VERSION)

ADDRESS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
SWITCH POSITIONS
#1
#2
#3
#4
#5
#6
Mark (#7 & #8)
0
ON
ON
OFF
OFF
OFF
OFF
Mastery Battery/Enable CAN BUS Port - ON
1
OFF
OFF
OFF
OFF
OFF
OFF
Slave 2 - OFF
2
OFF
ON
OFF
OFF
OFF
OFF
Slave 3 - OFF
3
OFF
OFF
ON
OFF
OFF
OFF
Slave 4 - OFF
4
OFF
ON
ON
OFF
OFF
OFF
Slave 5 - OFF
5
OFF
OFF
OFF
ON
OFF
OFF
Slave 6 - OFF
6
OFF
ON
OFF
ON
OFF
OFF
Slave 7 - OFF
7
OFF
OFF
ON
ON
OFF
OFF
Slave 8 - OFF
8
OFF
ON
ON
ON
OFF
OFF
Slave 9 - OFF
9
OFF
OFF
OFF
OFF
ON
OFF
Slave 10 - OFF
10
OFF
ON
OFF
OFF
ON
OFF
Slave 11 - OFF
11
OFF
OFF
ON
OFF
ON
OFF
Slave 12 - OFF
12
OFF
ON
ON
OFF
ON
OFF
Slave 13 - OFF
13
OFF
OFF
OFF
ON
ON
OFF
Slave 14 - OFF
14
OFF
ON
OFF
ON
ON
OFF
Slave 15 - OFF

FREQUENTLY ASKED QUESTIONS

How do you set up multiple batteries?

See table above and check your product manual for a more detailed explanation. You will have to set dip switch settings per battery to give them a unique address. You also must connect the included RJ45 battery link cables into the "Battery Link" port of each battery. Ensure your master battery dip switch 1 is on, 2,3,4 is OFF.  Only the master battery CAN Bus will be enabled. You can then connect the Hubble Cloudlink into the CAN port of the master battery for communications to work.